Latest Photos
Introduction
ECO Step Adhesive is an advanced formula, combining a unique 4-in-1-polymer + adhesive developed with the professional timber floor installer in mind.
It offers more features in the one process then most adhesives on the market, replacing the need for multiple products, such as a moisture barrier, ply sheeting and acoustic matting when installing a floor.
It is a no nonsense environmentally friendly product with no solvents or VOC’s and offers exceptional heat and cold tolerances (-40º to + 90º).It meets and can even well exceed Australian standards for sound and impact noise control 62Db(any void less cavities, test results may be required) and lastly it has a timber flex agent allowing the flooring to expand and contract.
A successful installation requires proper preparation of the sub floor. Read and understand all applicable guidelines and technical data sheets before beginning installation.
Follow industry standards and flooring manufacturer’s recommendations for sub floor moisture content, design, layout and application of flooring materials.
All slab constructions must meet the specificBCA requirements for the floor covering to be installed. Sub Floor Examination prior to starting, the sub floor must be checked according to ATFA and BCA installation guidelines. It must be flat, dry, clean, free of divots, loose debris, structurally sound as well as pressure and tension resistant.
When used in conjunction with a 6mm notched trowel a moisture barrier is created. Sub Floor Preparation is critical cracks and dips must be filled with suitable fillers unless they are expansion joints, all humps or high points should ground down.
Avoid excessive over use of ECO Step adhesive thickness by pushing the trowel evenly through the adhesive at the correct angle of 45 degrees.
Installation should begin immediately laying flooring by dropping the board and meeting the tongue and groove on 45 degree angle directly over the line of the previous board to avoid pushing adhesive between the two boards and creating possible gapping in the flooring.
Adjust the board correctly into position and press down firmly. Do Not Roll ECO Step Adhesive as a method of application. Be sure to check the boards regularly to ensure good contact transfer from Subfloor to flooring. Any bowed or springboards should be weighted down until ECO Step
adhesive sets
It offers more features in the one process then most adhesives on the market, replacing the need for multiple products, such as a moisture barrier, ply sheeting and acoustic matting when installing a floor.
It is a no nonsense environmentally friendly product with no solvents or VOC’s and offers exceptional heat and cold tolerances (-40º to + 90º).It meets and can even well exceed Australian standards for sound and impact noise control 62Db(any void less cavities, test results may be required) and lastly it has a timber flex agent allowing the flooring to expand and contract.
A successful installation requires proper preparation of the sub floor. Read and understand all applicable guidelines and technical data sheets before beginning installation.
Follow industry standards and flooring manufacturer’s recommendations for sub floor moisture content, design, layout and application of flooring materials.
All slab constructions must meet the specificBCA requirements for the floor covering to be installed. Sub Floor Examination prior to starting, the sub floor must be checked according to ATFA and BCA installation guidelines. It must be flat, dry, clean, free of divots, loose debris, structurally sound as well as pressure and tension resistant.
When used in conjunction with a 6mm notched trowel a moisture barrier is created. Sub Floor Preparation is critical cracks and dips must be filled with suitable fillers unless they are expansion joints, all humps or high points should ground down.
Avoid excessive over use of ECO Step adhesive thickness by pushing the trowel evenly through the adhesive at the correct angle of 45 degrees.
Installation should begin immediately laying flooring by dropping the board and meeting the tongue and groove on 45 degree angle directly over the line of the previous board to avoid pushing adhesive between the two boards and creating possible gapping in the flooring.
Adjust the board correctly into position and press down firmly. Do Not Roll ECO Step Adhesive as a method of application. Be sure to check the boards regularly to ensure good contact transfer from Subfloor to flooring. Any bowed or springboards should be weighted down until ECO Step
adhesive sets
Contact Info
Address:
ECO Timber Group Pty Ltd 418 Burnley St (cnr Madden Grv) Richmond 3121 VIC
Richmond VICTORIA
3121
Australia
Richmond VICTORIA
3121
Australia
Tel:
(03) 9421 6866
Website:
http://www.ecostep.com.au
Offering
- wood floor glue
- wood floor adhesive
- glue for parquet flooring.
Hours of operation
| From | To | From | To | From | To | ||
|---|---|---|---|---|---|---|---|
| Monday | Open | 9:00 am | 5:00pm | ||||
| Tuesday | Open | 9:00 am | 5:00pm | ||||
| Wednesday | Open | 9:00 am | 5:00pm | ||||
| Thursday | Open | 9:00 am | 5:00pm | ||||
| Friday | Open | 9:00 am | 5:00pm | ||||
| Saturday | Open | 9:00 am | 3:00pm | ||||
| Sunday | Open | ||||||




